← Knowledge
Basic Data Required for Rubber Fender Design
Customers can fill in the data below and send it to Fendersys, and we will recommend a suitable fender system for your berth.
| Item | Design data | |
|---|---|---|
| General information | ||
| Project name | ||
| Inquiry and/or contract | ||
| Port & country | ||
| Vessel parameters | ||
| Vessel type | ☐ Oil tanker ☐ Ore carrier ☐ General cargo ship ☐ Container ship ☐ LPG/LNG carrier ☐ Other | |
| Displacement / DWT | max: ______ min: ______ | |
| Vessel dimensions | Length | max: ______ min: ______ |
| Beam | max: ______ min: ______ | |
| Depth (height) | max: ______ min: ______ | |
| Laden draft | max: ______ min: ______ | |
| Belted hull (yes/no) | ||
| Fender panel face pressure | ______ t/m² | |
| Berthing conditions | ||
| Berthing velocity | ______ m/s | |
| Berthing angle | ______ degrees | |
| Berthing mode | Quarter-point (1/4) berthing (or other) | |
| Wharf structure | ||
| Wharf structure | ☐ New build ☐ Upgrade of existing wharf ☐ Concrete structure ☐ Steel structure ☐ Other | |
| Wharf conditions | ||
| Total wharf length | ______ m | |
| Water depth | ______ m | |
| Tide levels | Design high water level | ______ m |
| Design low water level | ______ m | |
| Fender mounting area on wharf | Height | ______ m |
| Width | ______ m | |
| Fender installation elevation | Top | ______ m |
| Bottom | ______ m | |
| Fender spacing | ______ m | |
| Allowable reaction force | ______ tons | |
| Fender layout | ||
| Other requirements | ||
| Other special requirements | ||